Environmental Design and Construction Magazine
  Home
  Advertising
  Subscribe to ED+C
  Subscription Customer Service
  Online Collections
  Enviro-Blog
  Digital Edition
  ED+C eNews
  Web Exclusive Editorial
  EDU+cast Webinars
  White Papers
  Case Studies
  Videos
  Current Issue
  Cover Story
  Features
  Columns
  Industry News
  Products
  Resources
  ED+C Archives
  Sustainable Home Archives
  Career Center
  AEC Store, Books + Videos
  Calendar of Events
  Classifieds + Marketplace
  GREEN Book
  Industry Links
  Product Info (FREE)
  Radiant Flooring Guide
  Market Research
  Green Digital 09
  ED+C Information
  Special Sections
  Sustainable Home
  LEED Guide
  Cool Roofing
  Sustainable Flooring
  Concrete
  Indoor Air Quality/ GREENGUARD
Search in: EditorialProductsCompanies
TCF Bank Stadium Achieves LEED Certification

September 21, 2009

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



Minneapolis / St. Paul -- The University of Minnesota announced that TCF Bank Stadium has been awarded LEED Silver certification. Located on the East Bank of the Twin Cities campus, the 50,805-seat TCF Bank Stadium, designed by Populous, is the new home for Golden Gopher Football and the University of Minnesota Marching Band. It is just the 6th on-campus football stadium of its size to be built in the last 50 years.

"There's no better experience than seeing 50,000 Gopher fans coming back to campus to celebrate Minnesota football, and to be able to do that in a stadium that's respectful of the environment was paramount for us from day one," said Scott Radecic, Populous senior principal.”And perhaps more importantly, the University now has a stadium that’s not only environmentally sustainable, but economically and socially sustainable as well.”

LEED Certification of TCF Bank Stadium was based on a number of green design and construction features that positively impact the project itself and the broader community. The campus location of the stadium leant itself to several opportunities, including alternative transportation, development density, shared mechanical equipment with nearby facilities and a reduced need for additional surface parking. The stadium is within a five-minute walk of more than 200 transit stops per day on 13 transportation routes.

Other sustainable design elements include:

* A stormwater management system that allows rain water to be captured into a comprehensive underground filtering system outside the stadium, where it is harvested, filtered and drained into the Mississippi River.

* Extensive measures taken to ensure the proper function, both now and in the future, of the project’s energy related systems.

* Incorporating water efficiency measures, such as regulated lavatory faucets and low-flow urinals that are expected to save 560,000 gallons of water per year, and low-maintenance landscape design that will save 4.8 million gallons of water per year.

* Graphic design elements that enhance the educational experience of learning more about the building’s green design elements.

"TCF Bank Stadium is an historic project for the university and it was important to us to do it right," said University of Minnesota President Robert Bruininks. "This designation, in particular, underscores the commitment of the Board of Regents and the leadership of the university to principles of sustainability, energy conservation and responsible stewardship of our environment and our resources."


|PrintEmail
  Comments (0)Post a Comment
 
 


Did you enjoy this article? Click here to subscribe to the magazine.





BNP Media
© 2010 BNP Media. All rights reserved. | Privacy Policy